Specifications include, but are not limited to: Phase I Roadway Design: Borings, traffic data, and other appropriate data gathering shall be included in this phase. Investigative excavations (i.e. test pits) to determine the existing conditions as it pertains to abandoned trolley tracks shall be included in this phase. Environmental testing of rail ties (if applicable) and soil around rails shall be included in this phase. Review and consideration of previous gateway, circulation, and transit studies. Consideration of green infrastructure and BMPs, particularly in parking areas. Review and consideration of traffic calming measures and pedestrian travel needs. Meetings with town staff. Development of preliminary site plans and exhibits for public information meetings. Attendance and presentation at 4 public night meetings to review the preliminary design and gather input from residents, commissions, and stakeholders. Revisions as necessary to proceed to final design.