Specifications include, but are not limited to: 1. Entryway glass for the following buildings being serviced will be cleaned an additional time each day (during the day shift – the day porters may be used to perform this task): • #252 Torrey Life • #331 A,B,C and D (Gant Plaza) • #349 Psychology • #415 Pharmacy • #434 ITEB • #386 Oak • #387 McHugh Hall • #503 Engineering Science Building 2. The following facilities shall receive an additional restorative floor/carpet care event (stripping/waxing or extraction) in entryways and main corridors, to occur during the winter months. The cost/staffing for this service must be included in the fixed price: • #252 Torrey Life • #331 A, B, C and D (Gant Plaza) • #364 Babbidge Library • #486 Oak • #487 McHugh Hall • #503 Engineering Science Building 3. #364 Babbidge Library As stated in the “weekend” portion of the RFQ, the Babbidge Library will receive two (2) am/pm 4 hour shifts of coverage on both Saturday and Sunday, to be included in the base contract pricing. Additionally, this Library has extremely high traffic during the four exam weeks each year. The Service Provider shall double the daily cleaning tasks frequencies during these four weeks (to be included in the base contract pricing), in the following area types: Corridors, Entrances / Lobbies, Library Space, and Restrooms. A Chariot-type vacuum system is recommended for this building, and may allow for additional interim carpet care or encapsulation. Additionally the Service Provider shall use appropriate chemicals to remove any graffiti in the Library or other buildings. 4. Police and Fire Complex The Public Safety building will receive an additional full service day on the weekend to be included in the base contract pricing. 5. Certain buildings at the Storrs/Depot campus may be “mothballed” or closed for renovations during the terms of this agreement (see Notes in Exhibit A for current list). These buildings are NOT to be included in the proposed base price. The Service Provider shall only include pricing for those buildings that show square footage summary charts in Exhibit A. Within 60 days of re-opening, the Service Provider shall comply with the instructions in the Scope of Services section to provide pricing for the closed buildings.