Specifications include, but are not limited to: Generally the work will include an updated kitchen and food service operation at the Glastonbury High School, including new kitchen equipment with a new layout to provide better workflow and address some existing ADA issues. The project is a 3,290 sf renovation at the existing high school, which includes the existing kitchen, adjacent corridor and food storage area. The project includes renovating 537 sf of the existing cafeteria space and incorporating it into the kitchen. Included in the new kitchen is a private office, locker room, staff water closet and cleaning storage area. The project includes new kitchen equipment and all associated mechanical, electrical and plumbing work as required to support the new layout.