Specifications include, but are not limited to: Work in collaboration with hazardous waste contractor to drain and capture all contaminated acidic glycol and dispose of material at an approved and permitted facility by CORS Work in conjunction with District Personnel to add MC-1 and DG-3 cleaners that the District will supply Work in conjunction with District Personnel to fill the entire system with water, vent the air, and ensure every control valve is open and start all necessary pumps and let circulate for 48 hours Once cleaning solution and degreaser has circulated for 48 hours, proceed to turning off pumps and clean every strainer in the building Once all cleaning is done, and it has been verified that all strainer openings have been secured, start pumps and circulate solution for another 48 hours then dispose of through CORS Flush the entire system again with water and dispose of all water with CORS ensuring at all times that nothing leaches into the ground or sewer system