Specifications include, but are not limited to: a. Repair damaged signage, when able, according to GBT’s specification; b. Replace and/or relocate signage, according to GBT’s specification; c. Install new signage, according to GBT’s specification; d. Collect, transport and dispose of damaged signage material; e. Build signage from stocked material (posts, flags, etc.) as needed, to meet GBT requests for signage repair, replacement, installation, etc; f. Contractor will utilize their own tools, equipment and hardware (nuts, bolts, washers, etc.) to perform requested bus stop maintenance; g. Contractor shall notify “Call Before You Dig” and verify utility mark-out prior to the initiation of any activities, which disturbs the earth on or below the surface; h. Contractor will consult with GBT before initiating work, if the contractor is uncertain of the task to be performed or where a bus stop sign should be located.