Specifications include, but are not limited to: · SCRAPE AND CLEAN ENTIRE STEEPLE USING HAND TOOLS AND LIGHT SAND. HEPA VACUUM ATTACHMENTS WILL BE USED IN ORDER TO REDUCE THE AMOUNT OF DUST CREATED BY SCRAPING. A 20'-0" PERIMETER WILL BE ESTABLISHED AROUND THE BASE OF THE CHURCH WITH LEAD CAUTION SIGNS. ANY CHIPS THAT FALL ON THE GROUND WILL BE VACUUMED UP AT THE END OF EACH WORKING DAY. · APPLICATION OF ONE (1) COAT OF MAD DOG PRIMER TO ENTIRE STEEPLE. (MADDOGPRIMER.COM) · AFTER PROPER CURING TIME; CAULK, GLAZE AND SEAL ALL IMPERFECTIONS. · SET AND SEAL ALL EXPOSED NAIL HEADS. · REPLACEMENT 30% OF MINOR DRY OR WET ROT FROM ENTIRE STEEPLE. REPLACED ROT WILL BE REPLACED IN KIND WITH AZEK MATERIALS. · ALL MILLWORK WILL BE DOCUMENTED AND SUBMITTED ON DRAWINGS FOR FUTURE DOCUMENTATION. PVC MATERIALS WILL BE REPLACED IN KIND AND WITH PVC MATERIALS IN SECTIONS AND TO KEEP AWAY FROM MIXING LUMBER AND PVC. IF IT BECOMES AN ISSUE WITH MIXING MATERIALS USE SPANISH CEDAR OR MAHOGANY. ALL FASTENERS WILL BE STAINLESS STEE