The scope of work shall include the following: Demolition and removal of debris from existing doors. This work includes, but is not limited to, the doors, hardware, and frames. The overhead areas of the existing doors shall not be disturbed, as there is evidence of asbestos materials. Contractor shall provide lead paint and asbestos-containing caulking remediation of the existing frames, brick molding, and trim work as required in compliance with EPA and all pertinent regulatory requirements specific to hazardous material remediation. If these areas need to be disturbed for demolition or installation purposes, an abatement plan shall be submitted. The Contractor shall field measure each door opening to ensure a proper fit (height, width, and depth) of the door to be ordered and installed by the Contractor.