Loading...
Skip to main content
< Back to results

Energy Center Boiler Maintenance


Location
Connecticut
Publication Date
06/07/2019 10:45 AM EDT
Closing Date
06/18/2019 02:00 PM EDT
Issuing Organization
Southern Connecticut State University
Solicitation Number
Description

Specifications include, but are not limited to: • Inspect/assess all operating controls, safety valves and devices for proper operation on both oil and gas. Disassemble the low water cutoffs and inspect the wiring (remove the probe and clean if applicable). Remove sediment from the low water cut off cross piping. Perform a slow drain test of the low water cutoffs. • Inspect all sight glasses. Clean and replace as needed. • Remove and clean atmospheric burners or clean the blower fan if a power burner is used. • Test the air switch. • Clean, set and inspect the pilot assembly, controls and pressure switches. • Perform pilot turn down test if an infrared or ultraviolet flame scanner is used. • Drain the boiler water and remove the scale from the vessel. • The boiler waterside and fireside shall be opened, cleaned and inspected for defects and damage. • Inspect and verify combustion damper operation. Inspect and clean louver openings as required.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids