Specifications include, but are not limited to: Any and all erosion control measures required for all site work. Any and all tree and brush removal required to complete site work Any removal and replacement of fencing, (must replace in kind) Excavation to include any and all saw cutting of existing sidewalk, all trenching and backfilling, sidewalk repair and landscaping. Installation of duct bank. Purchase and installation of transformer pad. Installation of any and all required bollards. All relocation of existing steam piping and plumbing. (Insulation included) Infill of wall, new wall and back boards for new service and any new panels. All cutting, patching, coring, weather tight seal. All construction cleaning and debris removal associated with this work All temporary power and lighting. Electrical contractor shall be responsible for scheduling and coordination with Eversource. Electrical contractor shall provide equipment lead times with proposal. Electrical contractor shall provide and coordinate the project schedule with the East Granby DPW Any and all work associated with this project will be subject to final approval and acceptance by the local officials (Building and Fire Marshal) and the DPW.