Specifications include, but are not limited to: This is a Design Build project, where a Base Technical Concept has been developed by the Department to include a new parking garage for Stamford Transportation Center for approximately 960 vehicles. The proposed parking garage will be located west of Washington Boulevard, between I-95 (to the north) and the railroad tracks (to the south), and will span above South State Street. A ramp will connect from the southeast corner at the second floor level of the proposed garage to the existing northern most station platform adjacent to Track 5. The project also includes an enclosed pedestrian bridge, to be connected from the parking garage to the Stamford Train Station. Additionally, demolition is required of the existing on-site parking lot, existing South State Street roadway construction within the project limits, site lighting, and overhead electric power crossing the site. This project has a scope code of āNā, and a consultant start date of approximately March 2021.