Specifications include, but are not limited to: 1. Upgrading the Cider Mill Pump Station for the Town of Glastonbury. The major work proposed under this Contract includes, but it not limited to: 2. Construction of: a. The upgraded pump station consists of: a new precast pump station wetwell and building, generator and appurtenances associated with electrical, mechanical, concrete, instrumentation, plumbing and process equipment as indicated on the drawings. b. The installation of two (2) influent submersible sewage pumps, generator, piping, valves, fittings and appurtenances. c. The installation of a new retaining wall. d. Site work, dewatering, and landscaping. Including metal fence wood barrier installation. e. The installation of a section of sewer force main, sewer gravity mains, and all associated appurtenances to the upgraded pump station. f. Testing of all equipment systems for proper operation and performance. g. Other miscellaneous work as specified and as indicated on the Drawings. 3. Partial and/or Complete Demolition (to the limits shown on the Drawings) of: a. The existing generator enclosure, generator, concrete pad, and electrical appurtenances identified on the drawings. b. All components of the existing pump chamber, including but not limited to: access chamber, access hatch, hardware, piping, equipment, access stairs and platform and all other associated appurtenances. c. Existing underground propane tank and associated appurtenances. d. Existing chain link fence, trees, bollards, and retaining wall. e. Piping, conduit, structures, and instrumentation as indicated on the Drawings. f. Other removals/demolitions as shown on the Drawings and specified herein including abatement of PCB containing materials. B. Related Work Specified Elsewhere: 1. Construction Schedules: Section 01310. C. Coordination: 1. See Section 01050 for information on contract coordination. D. Removals, Relocations and Rearrangements 1. Examine the existing site for the work of all trades which will influence the cost of the work under the general bid. This work shall include removals, relocations and rearrangements which may interfere with, disturb or complicate the performance of the work under the general bid involving systems, equipment and related service lines, which shall continue to be utilized as part of the finished project. The Contractor is responsible for all coordination in this regard. 2. Provide in the general bid a sufficient amount to include all removals, relocations, rearrangements and reconnections herein specified, necessary or required to provide approved operation and coordination of the combined new and existing systems and equipment.