Specifications include, but are not limited to: The installation of new sewer lines for East Cargo Building 1 and East Cargo Building 2 located on Bradley International Airport off Cargo Road. The installation of the new sewer will consist of intercepting the existing sewer line, cleaning and flushing the existing 4” cast iron pipe, installing new cleanouts, installing new 4” SDR 35 PVC sewer line within the building under a concrete floor, and new 6” SDR 35 PVC outside of the building, under asphalt, and turf. Work will also include the addition of one drop sewer manhole, installing a new drop sewer in existing manhole, modification of existing sewer manhole inverts, protecting and supporting of existing utilities, capping of existing sewer line, and the removal existing sewer as required for the installation of the new sewer. All work will be performed to The Metropolitan District Standard (MDC).