Specifications include, but are not limited to: removal and replacement for portions of the existing wildlife fence in two separate sections. One section is to relocate approximately 3,100 linear feet near the southwest corner of the Airport on the westerly side of Runway 18-36, while the other section is to replace in place approximately 2,000 linear feet on the northeast corner of the Airport on the easterly sideof Runway 18-36. The work will include, but not limited to: installation of the 8-foot tall chain link fence with 3 strands of barbed wire having concrete post foundations; install a new FAA wildlife skirt, removal and disposal/salvage of existing fence and post materials; installation and maintenance of construction erosion and sedimentation control best management practices;restoration of growth to disturbed areas; and all other incidental items for a completed project