The intent of this project is to clear all brush, briars, vines, woody vegetation, snags, and trees with a 4” diameter at breast height (DBH) or less from the following areas: 1.The entire earthen dam structure consisting of the entire top, north and south slopes to where toe of each slope meets original grade. (Approximately 530’ in length) Manual clearing methods or low-impact track-mounted equipment shall be utilized, to avoid overcompacting or damaging the dam surface. 2.The side slopes, riprap armored channel, and adjacent dikes of the entire diversion swale from the grouted rip-rap inlet at the east end (behind address #80) to the westerly end of the rip-rap channel (address #126). (Approximately 1,500’ in length) 3.The approximate area of clearing is 5.75 acres.