Specifications include, but are not limited to: Perform thorough review of proposed plans, technical requirements and cursory review of specifications. Review design of proposed (new) sewer trunk line including layout, depths, manholes, and new lateral connections. Analyze all costs associated with project based on proposed “final” cost estimate, comment and revise, if applicable. Review the engineering design of any cofferdam, sheeting, and pilings that may be necessary for the project. Perform a site investigation, review all soil borings, soil conditions and site features along proposed layout. Reexamine all utility relocations and conflicts for project. Advise and comment on building connections being relocated to new line