Specifications include, but are not limited to: The Project generally includes, but is not necessarily limited to, the following major elements: 1. Removal of selected building materials and components. 2. Offsite disposal of all removed materials. 3. Provision of a new concrete loading dock and adjoining truck ramp/access, including metal loading dock canopy and asphalt shingle roof assembly (Add Alternate No. 1 - standing seam metal roof), dock leveler, dock bumpers, and all related components. 4. Provision of a new electrically powered overhead door. 5. Provision of a new exterior concrete stair with steel handrails, and other site mounted removable handrails. 6. Provision of new roof mounted gutters, downspouts, downspout boots, and connection to existing sub-grade storm water drainage system. 7. Provision of new sub-grade storm water piping.