A. The following services are required of the contractor: • The selected General Contractor shall provide all necessary materials and labor required to address: 1. Requirements of the contractual documents AIA-A101-2017, modified; AIAA101-2017ExhibitA, modified; and AIA-A201-2017, modified, 2. The modifications to the existing rigging system and provision of new rigging system, as reflected within the drawing package from Theater Design and Specification section 116010, 3. The installation of the new Loading Gallery, as reflected within the drawing package from McLaren Engineering Group, 4. Relocation of the existing water piping (to be hung from the new Loading Gallery), including insulation; location to be confirmed in field and to avoid conflict with any new work, 5. The demolition of the existing and installation of the new lighting system as reflected within the drawing packages from Theater Design and CES, and Specification section 260953, 6. The modifications to the existing audio and visual system and associated components as reflected within the drawing packages from Theater Design and D’Agostino & Associates, and Specification section 274100, and 7. All associated Permit fees. • Note that the project will be subject to Prevailing Wage Rates.