a. Design, Engineering & Permitting Supply design documents that provide the following minimum information: • Timeline/Project Schedule • System description • Equipment details, descriptions (e.g., Inverters, PV Modules & Racks), (specifications/data sheets) • PV module layout plan • Inverter and other equipment installation location plan • All engineering associated with structural and mounting • Performance of equipment components, and subsystems • Integration of solar photovoltaic systems with existing power source(s) • Electrical grid interconnection requirements • Controls, monitors, and instrumentation. • Remote System performance monitoring • Security for the system • Logistics and staging plan Identify an appropriate location for the solar photovoltaic inverter equipment and its related components and control systems and emergency disconnect that will meet the following criteria: • Ease of maintenance and monitoring • Low operating losses • Secured location • Compatibility with existing facilities • Architecturally and aesthetically compatible