Specifications include, but are not limited to: Contractor shall provide, including, but not limited to, snow and ice removal, and other related services for the Department of Energy and Environmental Protection (DEEP), located at the Ellington Landfill and Shelton Landfill.; 1. During an Event: I. Contractor acknowledges that the Facility is a twenty-four (24) hour a day, seven (7) days a year Facility. When an Event occurs, the Contractor shall continually plow and clean “curb to curb” driveways, parking lots, roadways, receiving dock areas, including the entire width and length of all entrances, exits, sidewalks, public sidewalks, stairways and other areas specified by the Client Agency throughout the Event.; II. Contractor shall return to the Facility to keep the entrances, parking lots, roadways, driveways, ramps, sidewalks, public sidewalks, stairways and other areas specified by the Client Agency free from ice and snow as many times as necessary during an Event.; III. Contractor shall clear snow and ice from around the gas collection system using shovels as specified by the Client Agency. Gas collection system includes all equipment necessary to operate the system. This includes gas collection wells, above and below ground piping, and the fenced area around the flare. ; 2. During an Event with Freezing Rain, Sleet, Hail, or a Mixture: I. Contractor shall provide a continual scraping and application of sand and salt mixture for asphalt surfaces, and concrete safe ice melt on all nonasphalt surfaces continually during the Event if freezing rain, sleet, hail or a mixture of some or all of these conditions occurs. Contractor shall perform a complete cleaning and scraping down to the bare pavement surface at the end of the Event, unless otherwise directed in writing by the Client Agency.; II. Contractor shall maintain all Facility areas identified in this Exhibit A continuously twenty-four (24) hours a day, seven (7) days a week, and clear all Facility areas during the overnight period. Contractor shall provide spot deicing application consistent with industry standards to all, walkways, building entrances, stairways, ramps, loading docks and sidewalks, including public sideways and other areas specified by the Client for the next morning following the Event.; 3. Snow Piling: I. Contractor shall be cognizant of the drainage pattern of Facility paved surfaces and shall not pile snow over drains.; II. Contractor shall not plow or pile snow into stormwater drainage basins.; III. Contractor shall avoid accumulation of snow piles over long periods of time to avoid unnecessary snow relocation onsite or offsite or both.; IV. Contractor shall not leave any snow piles that block sight lines at stop signs, traffic signals, or exits that exceed three (3) feet high at any time.; 4. Deicing: I. Unless otherwise directed by the Client Agency, the Contractor shall apply deicing applications during an Event as follows: a. Concrete safe ice melt as approved by the Client Agency on all non-asphalt surfaces.; b. Sand and salt mixture as approved by the Client Agency for asphalt surfaces.; II. During an Event, the Contractor shall apply multiple deicing applications, as necessary.; III. Deicing pricing is included as per Event pricing in Exhibit B -Price Schedule.