Specifications include, but are not limited to: 1. Snow Removal: a. The Contractor shall remove snow and provide salting and de-icing for the College on an on-call basis; b. The College shall contact the Contractor prior to a snowfall event to authorize service for that event. The College shall memorialize any authorization in writing; and c. The Contractor shall perform snow removal services only with prior written authorization from the College.; 2. Snow Plowing/Removal: a. The Contractor shall provide the necessary tools, equipment, and operator(s) to remove snow from the College facility 7 days per week and/or during any snow event; b. The Contractor shall be responsible for supplying salt mixture, de-icer, and any/all other materials, equipment and personnel necessary to provide contracted services; c. The Contractor shall clear snow from the following included but not limited to areas: all driving surfaces, entrances, exits, parking lots, and adjacent handicap bollards and walkways. At the request of the College, the Contractor may be required to remove snow from designated sidewalks (entire width and length), stairs, doorways (including fire exits/escapes), fire hydrants, emergency blue phones, front and back decks, ramps, and mailbox areas; d. Hand shoveling may be required and considered as part of the “per hour” pricing structure; e. Prior to the first snowfall, or no later than November 15th, the Contractor shall provide and install stakes or otherwise mark roadways, parking lots, speed humps and bumps, hydrants, islands, etc. as designated by the Building Maintenance Supervisor or the campus designated Grounds Supervisor/Snow Coordinator upon his or her request, at no extra charge to the College; 3. Salt/De-icing: a. Upon request of the College, the Contractor shall apply de-icing materials to the surfaces indicated by the College; b. De-icer used must be non-injurious to concrete and will be required for concrete areas (e.g., walkways, stairways, sidewalks, doorways, ramps, etc.); c. Contractor shall not use salt or any mixture containing salt on concrete surfaces; d. Contractor shall not use sand or any mixture containing sand; e. Hand spreading of material is allowed for sidewalks;