1.Roofing –Division 7 A. Remove existing roofing up to two layers on homeland dispose of properly. a) Replace degraded sheathing ($90.00 allowance per sheet allowance) b) Photograph any rot damage to sheathing and then any replaced sheets and send to Housing Rehab Specialist before roofing c) Provide and install first two courses with Ice and Water Membrane per GAF requirements (low sloped roofs between 2.12 and 4.12 pitch to be entirely covered with Ice and Water Membrane d) Install new lifetime architectural asphalt shingles manufactured by GAF on pitch greater than 2.12 and GAF Liberty SBS self-adhering cold applied asphalt roofing on low slope roofs less than 2.12 pitch e) Provide and install aluminum “drip” and “rake” edge flashing f) Replace all vents g) Color to be chosen by owner from manufacturers standard pipe and ventilation flashing systems, including but not limited to waste vents, bathroom, range and dryer ventilation h) Install new continuous ridge vent per GAF requirements i) Verify soffit ventilation, install vents as needed j) All work to be performed per building code requirements k) Refer to specifications for all work B. Masonry Chimney Flashing a) Replace existing chimney counter flashing with new copper flashing b) Remove Tar and Scarify existing brick masonry c) Install reglet joints and use masonry caulk at joint d) Solder all joints with lead solder e) All work to be performed per building code requirements f) Refer to specifications for all work 2. Plumbing A. Repair main waste line connection a) Located in basement “c” wall. b) Place pipe and joint as need ensuring proper connection to exterior line. B. Repair Oil tank connection leak a) Replace oil tank filter and all necessary connection b) Clean disturbed area at completion 3. Soil A. Infill area of soil depression a) Located next to cellar door “C” façade b) Approx ½ yard 4.Window Replacement A. Replace (3) DH windows. B. Install new DH windows. i. Located at B & C Façade (Kitchen Windows) b) Verify size c) Paint or stain new or disturbed work d) Install insulation in cavities and caulk all edges e) All windows to include energy star glazing package. f) Units to be white g) All operable units to include full standard fiberglass mesh screens h) Refer to specifications for additional information i) All work to be performed to code requirements 5. Doors- Division 7 a. Install new A facade entry door (verify size and handing) a) Remove and dispose existing door, jamb and storm b) Located on “c ” façade c) Therma-Tru “ Smooth Star” Energy Star or an approved equal d) Provide similar glass configuration to match existing doors per owner e) Double bore with Reeb On Guard composite jambs f) Provide new Schlage entry door hardware g) $180.00 maximum hardware budget) h) Plymouth, Wakefield, Camelot or Ashcroft collection i) Paint door and jamb as per manufacturers recommendations, including interior and exterior trim, owner to choose color and sheen b. Install new basement entry door (verify size and handing) j) Remove and dispose existing door, jamb and storm k) Located on “c ” façade l) Therma-Tru “ Smooth Star” Energy Star or an approved equal m)Provide similar glass configuration to match existing doors per owner n) Double bore with Reeb On Guard composite jambs o) Provide new Schlage entry door hardware (brass finish) p) $180.00 maximum hardware budget) q) Plymouth, Wakefield, Camelot or Ashcroft collection r) Paint door and jamb as per manufacturers recommendations, including interior and exterior trim, owner to choose color and sheen