Lead: This project is funded by the Department of Housing and Urban Development (HUD) and requires the use of lead safe work practices under 24 CFR Part 35 (Lead Based Paint Poisoning Prevention and Control in Certain Residential Structures). A Lead Inspection and Risk Assessment were performed on May 31, 2025 at this property by EnviroPlan LLC. Lead hazards were found. The contractor is responsible for all work specified in the attached abatement report dated July 19, 2025. A Lead Based Paint Clearance Inspection will be required at the conclusion of this project. All bidders should review section regarding disposal of lead materials. 1) Roofing –Division 7 A. Remove existing roofing up to two layers, satellite on home and dispose of properly . a) Replace degraded sheathing ($120.00 allowance per sheet allowance) b) Photograph any rot damage to sheathing and then any replaced sheets and send to Housing Rehab Specialist before roofing c) Provide and install first two courses with Ice and Water Membrane per GAF requirements (low sloped roofs between 2.12 and 4.12 pitch to be entirely covered with Ice and Water Membrane d) Install new lifetime architectural asphalt shingles manufactured by GAF on pitch greater than 2.12 and GAF Liberty SBS self-adhering cold applied asphalt roofing on low slope roofs less than 2.12 pitch e) Provide and install aluminum “drip” and “rake” edge flashing f) Replace all vents g) Color to be chosen by owner from manufacturers standard pipe and ventilation flashing systems, including but not limited to waste vents, bathroom, range and dryer ventilation h) Install new continuous ridge vent per GAF requirements i) Verify soffit ventilation, install vents as needed j) All work to be performed per building code requirements k) Refer to specifications for all work...