• The company shall furnish and install a new Modernfold Acousti-Seal continuously hinged electric operable walls-or agreed upon alternative system-in the existing opening and consisting of (21) panels. • New panels are to have an STC rating of at least 50, per ASTM E90-Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements. • The installer shall verify that the existing steel track and support structure is sufficient to support the new panels. Any structural modifications required are to be made by the installer, if necessary. • Refer to Exhibit 2, showing the drawing package provided by Modernfold, dated August 29, 2024. Installer is to verify all dimensions and information provided. • All materials and work will be in accordance with applicable codes and regulations. • The awarded contractor will be responsible for the removal and disposal of the existing room divider and the associated electrical components. • Scheduling of work is to be coordinated with Westport Facilities Department and Ted Hunyadi. The work will be completed following the completion of the 2025- 26 academic school year (mid to late June, 2026). • The work area is to be kept clean and orderly through the duration of the project. • Any additional damage created to the school property as a result of this project scope of work shall be repaired by the contractor at no further cost to the district. • Obtain all necessary permits as required (fees will be waived). • Note that the project will be subject to Prevailing Wage Rates.