Spring Street within the town of Winchester which unit prices shall include full compensation for all administrative costs, overhead, insurance and bonding costs and for furnishing all labor, supervision, materials, supplies, mobilization, transportation, tools, equipment, and for performing all work in connection with and reasonably associated with the designated item of work, to be completed in place, as directed and as described in the specifications. The project shall be under the care and control of the Contractor during any assigned task until such time as it is completed and accepted by the Director of Public Works or his designee. The Contractor shall be responsible for well and faithfully performing all work assignments as directed; for the means and methods of construction; for all costs arising from the nature of the work or from any unforeseen difficulties which may be encountered during the performance of the work; and for all losses or damage from the action of the elements during performance of the work. The various unit prices shall be full compensation for all costs of the project while under the care and control of the Contractor. B. The Contractor shall visit the work and fully inform himself of all existing and controlling conditions with respect to his work, the limitations of space in the work area, and the accessibility to and from the work site. C. The Contractor shall develop a plan of operations and a sequence of construction that will address, provide, and maintain an orderly, safe flow of traffic. D. The Contractor is solely responsible for means and methods in performance of the work. E. The Contractor's plan of construction for sheeting, shoring, bracing, bridging, stabilization or other acceptable means must provide for the safeguard and protection of all existing traffic and facilities. Said plan will be submitted to the Owner and Engineer for information only