Specifications include, but are not limited to: 1. Furnish all equipment, vehicles, labor and supervision to perform the following: a. Remove all snow from entrance roadways, parking lots, and other areas as listed and specified herein. b. School sidewalks are included in this bid 2. In the event of a snow storm, the contractor must commence plowing once the accumulation reaches one inch (1”) and plow continuously for the duration of the storm so as not to allow large accumulations of snow, and so that in the event emergency vehicles need to gain access to any part of the school grounds they will be able to do so. 3. All exit doors are to be kept clear of snow piles for egress into and out of each school as per Fire Marshal’s instruction. A plot plan will be provided outlining each doorway. 4. Sufficient vehicle access plowing and/or sanding must be done when accumulation has met the minimum as stated above OR when snow and/or ice conditions dictate salt/sand should be applied. The access clearing and/or sanding must be done on all storm days and/or when required by a thaw/free situation, even if the regular school day has been canceled or delayed in opening. 5. All areas requiring snow removal shall be completed by 6:00 AM, including school days, nonschool days, weekends and holidays, seven (7) days per week.