Specifications include, but are not limited to: Furnish all equipment, vehicles, labor and supervision to perform the following: 1. Remove all snow from entrance roadways, parking lots, and other areas of JBHS as listed and specified herein. Snow is to be removed or sanded/salted as soon as accumulation reaches a depth of one half inch (1/2") or more, every time it snows, and plow continuously for the duration of the storm so as not to allow large accumulations of snow, so that in the event emergency vehicles need to gain access to any part of the school grounds they will be able to do so. All areas requiring snow removal shall be completed by 6:00 am, including school days, non-school days, weekends, holidays, 7 days per week, unless otherwise stated. Areas covered by the contract are also to be done if there is a scheduled athletic or other type of event at a school, regardless of whether the school may have been canceled for that day, including weekdays, Saturdays, Sundays, or holidays. Snow shall be directed away from buildings and sidewalks and to the outside areas of parking lots. Areas requiring snow plowing are to be properly staked prior to the start of each snow season. This is to be done by the contractor. 2. Sand and salt all areas after removal of snow except where salt is prohibited. Sanding of all areas that have had snow removal shall be started immediately after removal of all snow. Additional salt/sanding or more frequent salt/sanding shall be done if so directed. 3. Sand/salt all areas after ice storms except where salt is prohibited. In the event of slippery conditions due to ice storms, freezing rain, or icy conditions, sanding and salting shall be started immediately. The Building Maintenance Supervisor may order sanding and salting at any time, if in her/his judgment she/he feels it is required in order to maintain safe driving and walking conditions. Sanding or spreading of salt shall be done by mechanical spreaders attached to the rear of the trucks. Salt is to be ice control salt. 4. Spot Sanding/Salting Spot sanding/salting shall be performed where run-off from melted snow has frozen. This sanding shall be done daily, if need be, and completed prior to school opening (6:00 am) or any other event taking place at any school.