0020801 A ASBESTOS ABATEMENT L.S. 1 0020903 A LEAD COMPLIANCE FOR MISCELLANEOUS EXTERIOR TASKS L.S. 1 0101000 A ENVIRONMENTAL HEALTH AND SAFETY L.S. 1 0101128 A SECURING, CONSTRUCTION AND DISMANTLING OF A WASTE STOCKPILE AND TREATMENT AREA L.S. 1 0101130 A ENVIRONMENTAL WORK - SOLIDIFICATION TON 20 0201001 A CLEARING AND GRUBBING L.S. 1 0201020 A REMOVE AND RESET WOOD FENCE L.F. 20 0202000 EARTH EXCAVATION C.Y. 840 0202100 ROCK EXCAVATION C.Y. 42 0202200 CHANNEL EXCAVATION - EARTH C.Y. 290 0202216 A EXCAVATION AND REUSE OF EXISTING CHANNEL BOTTOM MATERIAL C.Y. 65 0202217 A SUPPLEMENTAL STREAMBED CHANNEL MATERIAL EST. 1 $10,000.00 Ten Thousand Dollars and Zero Cents $10,000.00 0202218 A WASHING-IN SUPPLEMENTAL STREAMBED MATERIAL EST. 1 $5,000.00 Five Thousand Dollars and Zero Cents $5,000.00 0202315 A DISPOSAL OF CONTROLLED MATERIALS TON 405 0202529 CUT BITUMINOUS CONCRETE PAVEMENT L.F. 195 0203202 STRUCTURE EXCAVATION - EARTH (EXCLUDING COFFERDAM AND DEWATERING) C.Y. 1290 0204001 COFFERDAM AND DEWATERING L.F. 417 0204151 A HANDLING WATER L.S. 1 0209001 FORMATION OF SUBGRADE S.Y. 555 0210821 A WATER POLLUTION CONTROL EST. 1 $7,500.00 Seven Thousand Five Dollars and Zero Cents $7,500.00 0213100 GRANULAR FILL C.Y. 146 0216000 PERVIOUS STRUCTURE BACKFILL C.Y. 580 0216012 A CONTROLLED LOW STRENGTH MATERIAL C.Y. 5 0219001 SEDIMENTATION CONTROL SYSTEM L.F. 500 0219011 A SEDIMENT CONTROL SYSTEM AT CATCH BASIN EA. 7 0286001.10 ROCK IN DRAINAGE TRENCH EXCAVATION 0'-10' DEEP C.Y. 16 0286001.20 ROCK IN DRAINAGE TRENCH EXCAVATION 0'-20' DEEP C.Y. 5 0304002 PROCESSED AGGREGATE BASE C.Y. 185 0406170 HMA S1 TON 119 0406171 HMA S0.5 TON 84 0406172 HMA S0.375 TON 100 0406238 NON-TRACKING ASPHALT TACK COAT GAL 57 0406303 SAWING AND SEALING JOINTS LF 24 0406312 A GUTTER LINE SEALING FOR BRIDGES L.F. 233 0406999 A ASPHALT ADJUSTMENT COST (ESTIMATED COST) EST. 1 $5,000.00 Five Thousand Dollars and Zero Cents $5,000.00 0503001 REMOVAL OF SUPERSTRUCTURE L.S. 1 0505001 STRAIGHT ENDWALL C.Y. 4 0508050 SHEAR CONNECTORS EA. 800