The project consists of the turn-key replacement of fifteen (15) HVAC units, nine (9) at Edgewood School and six (6) at Lincoln Bassett School. Most are Roof Top Units (RTUs), some are Remote Condenser Units (RCUs) with section coils in nearby Air Handler Units (AHUs). The project will be design-build with "like-for-like" replacements. If like-for-like replacements are not available, a compatible solution must be proposed. Drawings and submittals must satisfy permitting and Connecticut Administrative Services requirements. The scope includes, but not limited to - removal and disposal, furnish and install, permitting, rigging, controls integration, and engineered drawings as applicable. Since work will occur when buildings are occupied, careful coordination will be required - including after school dismissal arrangements.