The Work includes renovation of the Auditorium and Gymnasium, power upgrades to the existing electrical service along with installation of a new generator, and HVAC upgrades. The Auditorium scope includes abatement of ACM flooring and gypsum ceilings followed by a new RTU (replacement), lighting, ceilings, flooring, seating, theatrical A/V and lighting, theatrical rigging, and finish improvements to the stage surround. The Gymnasium scope includes two new replacement AHUs and ductwork, painting of walls and exposed roof decking and joists, refinishing of the wood floor, and new motorized bleachers. The power upgrades scope of work includes a new 1500KW generator, new 4000A service and switchgear (in a new location separate from the existing main electrical room), new electrical panels and feeders for the new HVAC equipment, and new lighting in approximately half of the corridors. The HVAC scope includes six new RTUs (two of which are replacements) serving the gym, auditorium, and other spaces. The scope also includes replacement furnaces and dampers in nine existing-to-remain penthouses along with new condensers adjacent to the penthouses. New VRF cassette systems will be provided in three classroom wings serving approximately twenty-five classrooms. New RTU and condenser support steel will be provided at approximately eleven locations. The following work will occur in late winter/ early spring of 2026: VRF rough-in (second shift), some of the steel work to support RTUs and condensers (off-hours), power rough-in (RGS raceways) on the roof for the HVAC equipment and several new panels (normal working hours), and fitout of the new main electrical room (normal working hours) which includes slab-on-grade demolition and setting of switchgear and electrical rough-in.