Specifications include, but are not limited to: Dust Control: The contractor is responsible for dust control which may require sweeping and/or the application of calcium chloride. There will be no separate payment for dust control. 2” Schedule 40 PVC Conduit: The contractor shall install 2” Schedule 40 PVC Conduit as shown and described in the plans and specifications or as directed by the Town Engineer or assigned representative. Removal of Wires in Conduit and Below Grade Conduit Removal: The contractor shall remove existing conduit and existing wires as specified on the plans and specifications or as directed by the Town Engineer or assigned representative. 600V Copper Wire No. 12 AWG: The contractor shall install 600V Copper Wire No. 12 AWG per the plans and specifications or as directed by the Town Engineer or assigned representative. 2” Schedule 40 PVC Concrete Encased Duct Bank: The contractor shall install 2” Schedule 40 PVC Concrete Encased Duct Banks per the plans and specifications or as directed by the Town Engineer or assigned representative. Light Standard Foundation, Pole-Mounted Luminaire, Wall-Mounted Luminaire: The contractor shall install luminaires and the associated structures per the plans and specifications or as directed by the Town Engineer or assigned representative. Precast Polymer Concrete Handhole and Pull Box: The contractor shall install Precast Polymer Concrete Handholes and Pull Boxes and the associated structures per the plans and specifications or as directed by the Town Engineer or assigned representative. Power Pedestal: The contractor shall install power pedestals and their associated structures per the plans and specifications or as directed by the Town Engineer or assigned representative. E-100 contains additional information on this item. 5 Time Clock and Photocell: The contractor shall install the Time Clock and Photocell and the associated structures per the plans and specifications or as directed by the Town Engineer or assigned representative. E-200 contains additional information on this item. Vehicle Barrier Gate and Hydraulic Swing Gate and Pedestrian Door with Magnetic Lock Access Control: The contractor shall install the selected gate and the associated structures per the plans and specifications or as directed by the Town Engineer or assigned representative. Loop Vehicle Detector: The contractor shall install the Loop Vehicle Detector and the associated structures per the plans and specifications or as directed by the Town Engineer or assigned representative. Pedestal Mounted Access Control: The contractor shall install the Pedestal Mounted Access Control and the associated structures per the plans and specifications or as directed by the Town Engineer or assigned representative. 1 Conductor No. 12G AWG and 2 Conductor No. 12 AWG: The contractor shall install conductors and the associated structures per the plans and specifications or as directed by the Town Engineer or assigned representative.