The bid is to remove, store, inspect and provide a report with needed repairs and cost to repair (cost to repair not included in bid) and install in proper location in the Spring. Navigational Aids: Anchorage buoys — 10 buoys from Main Anchorage (A – K, excluding C), 2 buoys from Meadows Anchorage (A & B) and 2 Rocks buoys, one northwest area of Brockway, one furthest south of anchorage, and one No Wake buoy at the southern entrance to North Cove. Channel markers — 11 in North Cove, 4 in South Cove, 8 in Middle Cove Floats — Town Dock at Main Street, Mack Lane and Town Park (ramps for Mack Lane and Town Park to be stored with floats). Note: If the new float with pilings at Mack Lane is installed, it does not need to be moved for winter. Rock markers: • Remove two markers in the southern mooring field • Install one marker (furthest south) back in the southwest area of the southern mooring field • Install a second marker by the rocks on the northwest side of Brockway Island.