Responsibilities for proper handling of Hazardous Material will be as follows: Monitoring Abatement; Temperature controls will be provided by Automated Logic and will be quoted directly to the Town. Any demolition and Installation of temperature controls will be coordinated with Automated Logic and managed by the Contractor. Responsibilities for Temperature Controls will be as follows: Install Control Valves Furnish and install 120-volt circuit for Controls with. Figure one per room. The Contractor will follow the following sequence: • Work area preparation for abatement activities; • Abatement of scope of work here; • Final visual inspection and/or re-occupancy air clearance testing following completion of abatement activities; • Removal of regulated work area containment barriers. 3 Work Area Preparation 3.1 General A. Provide Ground Fault Circuit Interrupter (GFCI) devices, temporary power, and temporary lighting installed in compliance with the applicable electrical codes. A State of Connecticut licensed electrician shall make all installations. B. Provide temporary water for use during abatement as well as decontamination of equipment and personnel. C. Deactivate and/or isolate heating, ventilation, and air conditioning (HVAC) air systems or zones to prevent contamination and fiber dispersal to non-work areas of the building. D. Provide a temporary secured opening for exhausting High Efficiency Particulate Air (HEPA) filtered negative air exhaust from the work area to an exterior location away from persons who may potentially be outside of the building. 3.2 For Interior Abatement Activities A. Install a critical barrier of 6 mil polyethylene sheeting. Seal edges with glue and tape to form an airtight barrier isolating the work area. B. Construct a contiguous worker decontamination unit as required in Section 4. C. Install caution tape and “Asbestos Warning” signs on critical barriers creating a regulated area. Workers within the regulated area shall be restricted to properly trained, licensed personnel afforded the appropriate Personal Protective Equipment (PPE).