Specifications include, but are not limited to: 1) Doors Windows & Trim - Division 8 a) Replace or install doors where indicated on drawing SK-1. b) Remove existing wood window sashes and install replacement windows manufactured by Harvey or an approved equal at locations and sizes as indicated in drawing SK-1 c) Install insulation in cavities and caulk all edges d) Replace exterior wood trim as needed if degraded i) With energy star glazing package or an approved equal ii) All units to be white and have grill matching existing new windows (6 over 1) except for the bathroom window which will be 1 over 1 lite with frosted glass. e) All operable units to include standard fiberglass mesh screens f) All work to be to code and refer to specification for additional information 2) Finishes - Division 9 a) Repair subfloor throughout and install new vinyl flooring as indicated in drawing SK-1 b) Install sheetrock throughout – provided by owner. Finish with 3 coats drywall compound c) Paint all new sheetrock, doors and trim with one primer and 2 finish coats – color to be determined.