Solicitation # 36C24125Q0433; VACHS West Haven and Newington Annual Boiler Inspection Q&A Can you please provide a complete equipment list of boilers and DA & Condensate tanks at each site? Equipment list has been incorporated into the SOW. Can you please provide more information on section 6.4: ( h) Test functionality of Un-interruptible power supply (UPS) system supporting the boiler plant. the revised SOW removes this requirement along with g and i. (i) Test and inspect emission control system (ie. Selective Catalytic Reducers (SCRs), etc.) the revised SOW removes this requirement. Please schedule pre-bid walk through s for both West Haven and Newington for the Boiler Inspection Services: Bidders shall perform a pre-bid walkthrough at 8:30 a.m. on June 18, 2025 at VA Medical Center West Haven located at 950 Campbell Avenue, West Haven, CT 06516. Meet at Building 15 and obtain a temporary day badge and complete a sign-in sheet. Bidders shall perform a pre-bid walkthrough at 1:00 p.m. on June 18, 2025 at VA Medical Center Newington located at 555 Willard Avenue, Newington, CT 06111. Meet at Building 3, 3rd floor and obtain a temporary day badge and complete a sign-in sheet.