Specifications include, but are not limited to: Courts will be rolled to compaction prior to cleaning. Excess surface materials will be removed, scraped with the use of lutes, and disposed of off-site. Remove all vegetation, dead materials and leaves. Courts will be scarified as required and leveled with a 12’ straightedge. Baselines will be patched to improve heavy wear zone, including build-up at tennis nets. Also to include laser grade to fill in all ruts, holes, and depressions cause by fall, winter and spring runoff. A minimum of one (1) ton of HAR-TRU or equal clay product will be applied per court and spread evenly throughout the court using a mechanical spreader to allow even distribution. - Courts will be hydrated, brushed and rolled to proper compaction. - Courts will be surveyed, and new top grade lines will be laid out and installed. - Each court will require one-hundred (100) pounds of Calcium Chloride. - Courts will be groomed and nets will be installed to the proper height. - A minimum of three (3) references required of tennis court installation.