Where electrical wiring/piping is not currently in place, electrical work shall be installed and concealed in the same manner and fashion as other wiring/piping in that area of the building. 1. Purchase and install 150 KW Generac Liquid-Cooled Gaseous Automatic Generator (Natural Gas) 2. Install concrete pad for generator. The location is where dumpster is currently located. 3. Install concrete safety bollards around generator pad. 4. Purchase, wire, and install an 1200amp automatic transfer switch. 5. Purchase, wire, and install a manual transfer switch with cam locks to be able to hookup a backup generator in the future if the permanent generator is out of service. 6. Disconnect old generator and circuit wiring to panel. (leave generator in place) 7. Crane new generator in place. 8. Install Gas related piping as necessary. 9. Purchase, wire, and install remote annunciator. 10. Any damage caused during the construction process shall be remedied so as to return conditions to preconstruction condition.