Wheeler High School: a) A general description of the Work, which is further clarified in the Specifications, under this Contract includes, but is not limited to: i) Furnish and install all new PVC mainline and lateral piping, isolation valves, fittings, and any other necessary pipeline appurtenances for the irrigation system, including connection to the water source to all 3 athletic fields. ii) Furnish and install new control valves, Irrigation Heads and quick coupler valves with swing joint assemblies and all necessary fittings, valve boxes, etc. to all 8 athletic fields where applicable. iii) Furnish and install a new 2” backflow device at the water connection that meets the requirements of local and national codes. iv) Furnish and install a new smart, wireless irrigation controller with wireless weather sensing equipment, wireless soil moisture monitor, and internet control module, including all necessary electrical supplies and internet capabilities. Provide one winterization and spring start-up of the irrigation system after the entire installation has been completed and approved by the BOE