A. The Contractor shall service the following areas of the Groton Data Center: 1) 9,000 sq. ft. of raised flooring located on the 2nd floor, including one hundred fifty (150) server cabinets and thirty-six (36) four-post racks. 2) Break room located on the 2nd floor (300 sq. ft. Linoleum). 3) Carpeted Lobby and Command Center located on the 2nd floor (1200 sq. ft.). 4) Entire Hallway (1200 sq. ft. Linoleum) located on the 1st floor; and 5) The front and back stairwells and the freight elevator are located on the 1st floor. B. The Contractor shall service the following areas of the Hartford Data Room: 1) 450 sq. ft. of electrostatic discharge (“ESD”) tile on the 1st floor; and 2) 10 server cabinets and three (3) two-post racks on the 1st floor. C. The Contractor shall service the following areas of the Newington Data Center: 1) 4,400 Sq. Ft. of electrostatic discharge (“ESD”) tile on the 1st floor; and 2) 47 server cabinets, two (2) four-post rack and one (1) two-post rack are on the 4,400 sq. ft. located on the 1st floor.