1.3 PROJECT DESCRIPTION The project is for the Concourse Park site work and consists of the installation of erosion and sedimentation control, site demolition, earthwork, underground utilities, including storm drainage, sanitary sewer, water, gas, electric and telephone/cable, grading, curbing, paving, sidewalks, site lighting, signage and plantings. Running parallel to the above-mentioned Concourse Park site work, Jasko Zelman 1, LLC (“Jasko”) will be overseeing the construction of the apartment community buildings, consisting of apartment buildings, garages, a clubhouse, a mail building and trash and maintenance buildings. The successful bidder for the Concourse Park site work will be required to maintain access for Jasko’s contractors to the building locations throughout the site and coordinate with Jasko’s contractors in the development of a logistics plan that will ensure both projects can proceed efficiently. PART 2 – PROJECT SCOPE OF WORK & SCHEDULE 2.1 Scope -- This project includes, but is not limited to: A. General Requirements a. Procuring all necessary municipal building, roadway work and road closure permits necessary for construction. b. Coordinate and schedule all required inspections, including, but not limited to, Town of East Hartford, MDC, Connecticut Natural Gas, Eversource, Frontier and Comcast. c. Develop a comprehensive staging plan for the Owner’s approval. Provide monthly update of the approved staging plan or more often if required. d. Develop a detailed critical path construction schedule for the Owner’s approval. e. Maintain overall construction sequence and staging in accordance with the approved staging plan and construction schedule. f. Provide overall utility coordination and scheduling of inspections. g. Provide quality control testing and certification. h. Provide traffic control as needed. i. Provide temporary facilities, including temporary power necessary to complete the Work. j. Provide temporary signage, barricades and fencing as required to maintain a safe and secure site. All open excavations must be protected with hard fencing. k. Conduct biweekly meetings with the Owner. l. Provide weekly photo documentation and daily reports documenting construction activity. The daily reports shall include a list of on-site equipment and labor, construction activity, soils leaving site (number of trucks and yardage), soils arriving on site (number of trucks and yardage) and vendor material deliveries.