The proposed project consists of the construction of approximately 3,200 linear feet of a new 4-foot wide concrete sidewalk with 5-foot wide concrete passing areas and some sections of 5.5 -foot wide monolithic concrete curb and sidewalk along the southern/eastern side of Century Hills Drive from the intersection of Cold Spring Road to the intersection of Kingsley Court. This sidewalk will be compliant with the Americans with Disabilities Act (ADA) and Public Right-of-Way Accessibility Guidelines (PROWAG) and will provide a safe, pedestrian-friendly route. Also included in this project are new concrete curb ramps and bituminous curb patching. The Metropolitan District of Hartford, Connecticut (MDC) owns the water and sanitary sewer utilities within the project area. The only anticipated conflicts are minor gate valve box and curb valve box adjustments that will be required during sidewalk construction which are provided for in the contract bid items. Eversource owns underground electric lines and street lights. Cox Communications owns underground cable and Frontier Communications owns underground telephone lines. Relocation of some of these lines and appurtenances will be required to accommodate the sidewalk and will be performed by others.