Contractor will provide all labor, materials and equipment to complete the following Work. Floor is Approximately 112’ 8” X 136 ½’ • Remove and dispose of existing floor, subfloor and cove base - areas under bleachers to be moved and abated by others • Move bleachers • Cover existing surface with 6 mil. Polyethylene vapor barrier overlapping at least 4” • Install white foam membrane • Install 1 layer of 15/32” plywood 90 degrees to the direction of finished flooring • Install 2nd layer of 15/32” plywood 45 degrees to direction of finished flooring • Cover plywood subfloor with a layer of red rosin builders paper • Install new first grade 2 ¼” x ¾” maple flooring • Sand three (3) times to prepare for finishing (course, medium, fine grits) • Clean surface by vacuuming and then tack with damp towels • Apply two (2) coats of BONA sealer • Paint game lines similar to existing- add painted border, large center logo, stained 3 point areas and baseline lettering to give floor an updated look • Apply an additional two (2) coats of BONA polyurethane • Install black Johnsonite vented vinyl cove base around the perimeter of the gym (excluding bleacher area) • Install aluminum thresholds at all doorways as needed