The contractor certifies that the contractor is prepared with the necessary capital, material, and equipment to conduct the work contracted at 14 Jude Lane, Mansfield, CT; Itemized costs for categories must be broken down as lead, code, waste, and further broken down as windows, porches, doors within lead. See the HRP deduct policy regarding owner's assumption of household waste. Attach additional sheets if necessary. Itemize specification items where alternatives are requested. A contractor may suggest additional alternatives and can be added to the Alternative Section. When an Alternative is added, then the contractor must bid both the original line item and the alternative separately, so that they may be compared. (Label alternatives as a subset of the applicable specification number). This house has been tested for lead based paint. This scope of work follows CT State laws surrounding lead remediation because the structure was built prior 1978. It will be the contractor’s responsibility to legally dispose of all waste created from the project. 1. Replace electric panel board a. Remove existing electrical service panel for home. b. Install electrical service panel for home. i. Ensure compatible generator switch ii. General repairs to wiring and plugs in garage to render safe.