The selected contractor shall: • Purchase the bus stop signs, signposts, all required hardware, and equipment; • Install 696 bus stop signs and poles with breakaway ability in designated locations; • All signs must be installed on a newly designated post. Signs cannot be installed on any other existing signpost, poles or any other potential sign fixtures; • Ensure compliance with ADA accessibility requirements, MUTCD standards, and any state and local ordinances; • Administratively responsible for all location placements within municipalities or State of Connecticut properties, including easements, permitting , and setbacks; • Coordinate with Call Before You Dig for each signpost location; • Coordinate all necessary permitting before install. It is possible that not all installs will require permitting; • Signs are required to be installed within thirty (30) days of receiving a permit; • Permitting fees to be included as part of the cost