▪ Isolate boiler and disconnect all controls, piping and supply lines, electrical and flue material. ▪ Remove and properly dispose of one (1) existing Bryan natural gas-fired boiler, including all demolition material. ▪ Supply and install one (1) new Weil-McLain 880 cast iron sectional boiler and Power Flame gas burner, including all related accessories required for complete operation of the equipment. Town will consider equal manufacturers for boiler and burner. Submit all details in proposal for review and approval by Town. ▪ Reconnect controls and tie-in to BMS, including electrical, gas supply and flue material. ▪ Replace all insulation removed as part of demolition work. ▪ Provide crane/hoisting/rigging service as necessary for removal of existing and installation of new equipment. ▪ Perform start-up, testing and commissioning for complete operation of new equipment. ▪ Controls disconnect/reconnect to be performed by Contractor. Note any technical proprietary work required to be performed for BMS will be scheduled by Town. ▪ Contractor must field verify all measurements due to restrictive access to boiler room via hatch located in the building garage. This includes all doors, stairs and railings located at egresses. Refer to appended pictures for detail.