Specifications include, but are not limited to: The project includes a sidewalk corridor along the west side of Hopmeadow Street beginning at the southern end at Hoskins Road and continuing north to the CTDOT Storage Facility/Park n' Ride. The design will include a 5ft wide concrete sidewalk along Hopmeadow Street that is approximately 4,400 LF with a varying snow shelf for a majority of the project area. The proposed sidewalk will consist of three (3) crosswalks and a proposed concrete retaining wall for approximately 100ft at the Saxton Brook crossing in order to support the proposed sidewalk and minimize potential property and/or wetland impacts. One (I) proposed sidewalk connection will be created to the existing concrete sidewalk along the eastern side of the Hopmeadow at Hoskin Road intersection. The project includes installation of decorative streetlights, to illuminate new sidewalk for pedestrians. Additionally, approximately 330 LF of new sidewalks will be constructed along Dorset Crossing Drive which will connect to Hopmeadow Street.