Specifications include, but are not limited to: The Town of North Haven invites qualified and responsible contractors to submit sealed bids for the Town of North Haven Bailey Road Baseball Field Improvements Project, North Haven, Connecticut; The General Description and project specifications apply to: new backstop and chain link fencing; site work coordination; the installation of player benches; and Bailey Road Baseball field renovations including reconstructed infield, infield mix, outfield, warning track, sodding proposed field area, with associated earthwork and associated loam and seeding. The Contractor’s responsibility shall include, but not be limited to, maintaining overall site conditions, maintenance and protection of traffic, installing and maintaining erosion control measures, excavation, removal, and importing of soils in area of proposed grading and regrading, management, and disposal, backfill and formation of subgrades, and reestablishment of surface conditions. All work shall be performed in strict accordance with applicable federal, state, and local laws, regulations, ordinances, and requirements. 1. Submission of electronic submittals of shop or working drawings as noted in the specifications, of equipment, structural details and materials fabricated for this Contract. Submission of samples in individual Contract Sections and Operating and Maintenance Manuals and spare parts lists. 2. Environmental Protection, including Compost Filter Sock and Silt Sacks for those areas of construction activity. Protection of water resources. Protecting and minimizing exposed areas and landscape. 3. Earthwork and related work, including loaming and seeding. This includes protection of existing property, drainage, frost protection and snow removal. 4. Excavation including strip, screen and stockpiling of topsoil in proposed area, management and disposal of excess materials, back fill, regrading and formation of subgrade. Work may include, but not be limited to, excavation equipment, pumping, backfill, hauling and compaction. Proper discharge of dewatering operations. 5. Dust control via calcium chloride and water. Separation and replacement of topsoil. Surface restoration of existing areas. 6. Completion of selective site demolition, including careful removal, protection, special requirements and products for backfill, temporary fencing, tree protection and field fencing. 7. Cast in place concrete, including earthwork, adhering to standard references such as American Concrete Institute (ACI) and ASTM, shop drawing submittals, concrete products, cement, admixtures, aggregates, and water.