A. Design, Engineering, Permitting, and Installation • Supply design documents that provide the minimum information outlined in Section 1.6 Part 4 • All engineering associated with structural, mechanical, and electrical connections • Maintain performance of equipment components, and monitoring system • Respondent will be required to provide building interconnection, integration of SEF with existing power source, and tie-in to existing building All plans and specifications in connection with the proposed SEF will be subject to peer review and approval by Pennoni (structural engineer). Refer to Appendix C for details. B. Installation / Construction • Supply all equipment, materials, and labor necessary to install the solar photovoltaic system at the building • The Respondent shall provide photography documenting electrical connections that may be obscured when SEF is complete • Provide high resolution (drone) progress photos documenting each step in the installation process: installation of racks / mounting apparatus, cabling, panels, ballast / slip sheet assemblage, power optimizers, inverters, electrical disconnects and all metering • Provide a plan describing the delivery, storage, and security for all materials and equipment while on site as acceptable to Requisitioner • In addition to meeting all necessary municipal and state codes, Respondent shall restore the property to its preinstallation condition. Any penetrations or modifications to the building (envelope, structure, equipment, etc.) must be described in initial plan and approved by the Owner’s Representative and Requisitioner