Partial Roof Replacement at Various Schools. ● The following is a summary of the various projects to be completed. They are listed in order of priority. The expectation is that the selected firm, once onboarded, will determine preliminary costs associated with each of these projects and then, in collaboration with Milford Public Schools, will select the desired projects to be completed based on available funding. At that point, the selected architectural and engineering design firm will begin the preparation of schematic design documents, construction documents and construction administrative services for the partial roof replacement at those selected schools. Location System Description Install Date Est. Replace Date Quantity Sq. ft. Life Cycle Product on Existing Roof / Notes 1 Orchard Hills School Roofing Computer room and art and music room 6/1/2003 6/1/2023 4500 20 Sarnafil 30 year TPO 2 Orange Avenue School Roofing Media center and 7 classroom addition 8/1/2005 8/20/2025 12300 20 Versico 30 year TPO 3 West Shore Middle School Roofing Roof, Modified Bituminous Built up Cafeteria Roof (Solar) 6/1/1999 6/1/2019 7730 20 John Manville Modified Bituminous 20 year