Coming Soon – The Town of Estes Park is seeking qualified contractors to submit bids for the installation of approximately 900 LF of a new 12” water line along Elkhorn Avenue in Estes Park. The project will tie to an existing 16” DIP with a new 12”x16” reducer on the west side near Moraine Avenue and to an existing 12”x12” tee on the east side near MacGregor Avenue. Traffic management is significant and the work is within a CDOT highway (Highway 34). The Town is obtaining CDOT permit for this work and will expedite Town permitting. The contractor will be responsible for stormwater permits.
The Town will provide all pipe, polyethylene wrap, fittings and valves. The Contractor will be required to provide the labor and equipment required for installation including bedding, backfill, kickblocks, temporary pavement, and permanent pavement. The Contractor must coordinate Town-provided pressure testing and disinfection. The project also includes replacement of approximately 18 water service lines from the new water main to the curb, installation of new curb stops, and reconnection to the existing service lines that enter businesses.
Time is critical for this project to complete paving and minimize public impacts, the Town will allow extended working hours and days and is amenable to alternative schedule-saving measures proposed by the Contractor. Incentive for early completion may be available.
The Town will be hosting a non-mandatory pre-bid virtual meeting on January 30 at 2:00 p.m. You can use the meeting information below or contact Jacqui Wesley (jwesley@estes.org) for a meeting invitation.
meet.google.com/ajn-kdvv-kiy
Dial: (US) +1 929-299-3969 PIN: 186 466 471#