Specifications include, but are not limited to: Project consists of: 1. Fabricating, manufacturing and installing parking wayfinding signage in the Town of Breckenridge, CO. The signs will consist of new Changeable Message Signs (CMS) as well as static signage directing drivers to parking. 2. The work will be phased over the 2018 and 2019 construction seasons in order to facilitate the construction timeline for work within the CDOT Right-of-Way (ROW). 3. The phasing of the work is as follows: a. Phase 1 (2018): 1) CMS 1: located along HYW 9 near MM 88.6 2) All static signage indicated by sign marks “S1” – “S6” b. Phase 2 (2019): 1) CMS 2: located along HYW 9 near Boreas Pass Road c. Phase 3 (2019): 1) CMS 3: located along HWY 9 near CR 450, Huron Road